This Second Edition of the Conditions of Contract for EPC/Turnkey Projects has been published by the Fédération Internationale des Ingénieurs-Conseils (FIDIC) as an update of the FIDIC 1999 Conditions of Contract for EPC/Turnkey Projects (Silver Book), First Edition. Along with the FIDIC 1999 Red Book (the Conditions of Contract for Construction) and the FIDIC 1999 Yellow Book (the Conditions of Contract for Plant and Design-Build), the FIDIC 1999 Silver Book has been in widespread use for nearly two decades. These Conditions of Contract for EPC/Turnkey Projects are not suitable for use in the following circumstances: – If there is insufficient time or information for tenderers to scrutinise and check the Employer’s Requirements or for them to carry out their designs, risk assessment studies and estimating; – If construction will involve substantial work underground or work in other areas which tenderers cannot inspect, unless special provisions are provided to account for unforeseen conditions or – If the Employer intends to supervise closely or control the Contractor’s work, or to review most of the construction drawings. FIDIC recommends that the Second Edition of the FIDIC Yellow Book (Conditions of Contract for Plant and Design-Build) be used in the above circumstances for Works designed by (or on behalf of) the Contractor. This Second Edition of the FIDIC Silver Book maintains the principles of risk sharing established in the 1999 edition, while seeking to build on the substantial experience gained from its use over the past 18 years. For example, this edition provides: 1) greater detail and clarity on the requirements for notices and other communications; 2) provisions to address Employers’ and Contractors’ claims treated equally and separated from disputes; 3) mechanisms for dispute avoidance and 4) detailed provisions for quality management, and verification of Contractor’s contractual compliance. These Conditions of Contract for EPC/Turnkey Projects include conditions, which are likely to apply to the majority of such contracts. Essential items of information which are particular to each individual contract are to be included in the Particular Conditions Part A – Contract Data. In addition it is recognised that many Employers, especially governmental agencies, may require special conditions of contract, or particular procedures, which differ from those included in the General Conditions. These should be included in Part B – Special Provisions. It should be noted, that the General Conditions and the Particular Conditions (Part A – Contract Data and Part B – Special Provisions) are all part of the Conditions of Contract. To assist Employers in preparing tender documents and in drafting Particular Conditions of Contract for specific contracts, this publication includes Notes on the Preparation of Tender Documents and Notes on the Preparation of Special Provisions, which provide important advice to drafters of contract documents, in particular the Employer’s Requirements and Special Provisions. In drafting Special Provisions, if clauses in the General Conditions are to be replaced or supplemented and before incorporating any example wording, Employers are urged to seek legal and engineering advice in an effort to avoid ambiguity and to ensure completeness and consistency with the other provisions of the contract. This publication begins with a series of comprehensive flow charts which typically show, in visual form, the sequences of activities which characterise the FIDIC EPC/Turnkey form of contract. The charts are illustrative, however, and must not be taken into consideration in the interpretation of the Conditions of Contract. This publication also includes a number of sample forms to help both Parties to develop a common understanding of what is required by third parties such as providers of securities and guarantees. Drafters of contract documents are reminded that the General Conditions of all FIDIC contracts are protected by copyright and trademark and may not be changed without specific written consent, usually in the form of a licence to amend, from FIDIC. If drafters wish to amend the provisions found in the General Conditions, the place for doing this is in the Particular Conditions Part B – Special Provisions, as mentioned above, and not by making changes in the General Conditions as published. FIDIC considers the official and authentic texts to be the versions in the English language.
FIDIC: Conditions of Contract for EPC/turnkey Projects, 2nd Edition
RM262.00
ISBN: 9782884320832
Year of Publication: 2017
Sold out!
| Category: | Construction Law |
|---|
Related products
-
Construction Disputes: Seeking Sensible Solutions
RM246.00Author: Wayne Clark’s
ISBN: 9781913019488
Country Of Publication: UK
Pub date: 25 Nov 2021
Format: HardcoverA Tribute to Stephen Hepburn
This book is dedicated to Stephen Hepburn, who I met in Interlaken, Switzerland, in July 20200, At this, our first-and, as it turned out, only – meeting, we enjoyed lunch and a few glasses of wine. Stephen encouraged me to write a book on construction contracts and claims. He encouraged me to write this book.We kept in touch regularly after our Interlaken lunch, chatting on the phone, exchanging emails and messages, and strategizing over my developing book.
Sadly, Stephen passed away suddenly on 8 January 2021. I miss him very much.
Rest in peace, my friend. -
The Law of Construction Disputes, 3rd Edition
RM2,100.00Now in a fully updated third edition, The Law of Construction Disputes is a leading source of authoritative and detailed information on the whole area of construction law including contracts and their performance, third parties, pursuing claims and dispute resolution. It covers the construction dispute process by analysing the main areas from which disputes arise, up to date case law, and how to effectively deal with construction project disputes once they have arisen. Now including references to the new FIDIC contracts, which were released in 2017, this edition expands on advanced practitioner issues, as well as the emerging law of construction disputes on an international basis and gives the practitioner all the case law needed in one concise volume.
The book examines the methods and methodology of construction law, not only for a common law context, but also under other legal systems. Readers will be guided through the various international contract formats governing construction, alongside applicable case law. Additionally, they will be shown the correct contract provisions and forms used to prevent disputes from escalating in order to reach successful conclusions without litigation.
Including expert advice and many relevant reference materials, this book is an extremely helpful guide to legal practitioners and construction professionals.
Table of Contents
1. Introduction to Construction Disputes 2. The Construction Contract 3. Design Disputes and Liability 4. Site Conditions 5. The Subcontractor 6. Defences to Construction Disputes 7. Issues Regarding Contractors Rights and Obligations Under Standard Form Agreements 8. Termination of Contract 9. The Certification Process 10. Types of Claims 11. Collateral Warranties 12. Non-Contract Liability 13. Time at Large and Time-Bar Clauses 14. Dispute Resolution 15. Key Issues in Dispute Resolution -
Dilapidations: The Modern Law and Practice
RM1,555.60This book is a leading authority in its field, providing comprehensive coverage of the legal principles relating to dilapidations, both residential and commercial, together with all the practical aspects pertaining to dilapidations claims. It offers a comprehensive, one-stop reference, assisting the reader with dilapidations issues and in determining of the best course of action. It discusses the legal principles clearly and accompanies this with worked examples showing how they apply in practice. It also includes precedents, forms, statutes and extensive case referencing. This book is now largely recognised by the courts and the professions as the leading work on dilapidations, and it is referred to, and quoted from, in many cases.
Key features:
- The text explores the obligations of landlord and tenant with regard to the state and repair of property
- Looks at repairing obligations, all types of repairing covenant, liability, considerations affecting the performance of obligations, liability, remedies, fees
- Explores alternative ways of resolving claims such as arbitration and proposals for reform this area of law
- It considers the rules in relation to both landlord and tenant and both commercial and residential property
- Offers a comprehensive and authoritative discussion of legal principles relating to dilapidations with examples as to how those principles might apply in practice using relevant case law
- Commentary is supported by relevant forms and precedents in the appendices
- The renowned author team offer a practical five-question approach to analysing the basic repairing covenants
New to this edition:
- A number of chapters have been substantially re-written, to reflect both further developments in the relevant law and practice, and the development of our own thinking
- Two new chapters have been added, one dealing with consequential losses (including loss of rent), and the other with contractual payment provisions. The former seemed to be of sufficient importance to merit its own separate chapter, whilst the latter deals with provisions which are becoming more common in leases
- The impact of the Minimum Energy Efficiency Standards, which are due to start affecting lettings on 1st April 2018, to consider
- Consideration of the impact of the Energy Act 2011, the 7th edition of the RICS Guidance Note “Dilapidations in England and Wales” (which came into effect on 1st September 2016) and the new Pre-action Protocol for Housing Disrepair Cases, which came into force on 6th April 2015
Recent cases referred to in this edition:
- Courtwell Properties Ltd v Greencore PF (UK) Ltd [2014] EWHC 184 (TCC)
- Sunlife Europe Properties Ltd v Tiger Aspect Holdings Ltd [2014] 1 E.G.L.R. 30
- South Essex Partnership University NHS Foundation Trust v Laindon Holdings Ltd [2016] EWCA Civ 377
- Edwards v Kumarasamy [2016] UKSC 40; [2016] 3 WLR 310
- Moorjani v Durban Estates Ltd [2016] 1 WLR 2265
- Creative Foundation v Dreamland Leisure Ltd [2016] Ch 253
- Consortium Commercial Developments Ltd v ABB Ltd [2015] EWHC 2128 (TCC)
- Uddin v Islington [2015] HLR 28
- Stratton v Patel [2014] EWHC 2677 (TCC)
- Mussellwhite v Youssefi [2014] EWCA Civ 885; [2014] 2 P & CR 14
- L Batley Pet Products Ltd v North Lanarkshire Council [2014] UKSC 27; [2014] 3 All ER 64
- Peel Land and Property (Ports No. 3) Ltd v Sheerness Steel Ltd [2014] EWCA Civ 100; [2014] 2 P&CR 8
- Reference will also be made to cases decided in Scotland, among them, Trustees for the Bridge Street Partnership v William Hill (Scotland) Ltd([2013] SLT (Sh Ct) 62 and PDPF GP Ltd v Santander UK Plc [2015] CSOH 40), and in the Commonwealth
-
Security of Payments & Construction Adjudication, 3rd Edition
RM765.00- Publication Date: Jul – 2022
- Author: Chow Kok Fong
- ISBN: 9789815019254
- Format: Hardcover
- Country: Singapore
RM850.00 -
Malaysian Specialist Intellectual Property and Construction Courts: Practice & Procedure
RM200.00- Publication Date : Dec – 2020
- Author : Dato Lim Chong Fong
- ISBN : 9789672919162
- Format : Hardcover + eBook
- Country : Malaysia
-
Construction Defect Claims in Malaysia
RM300.00Authors: Teng Kam Wah
Publisher: Sweet & Maxwell AsiaThis book focuses on the legal perspectives of claims for losses for defective work by and against the contractor. It also covers professional negligence, claims for pure economical loss, latent defects, as well as claims for financial and non-financial losses.
-
The Malaysian PWD Form of Construction Contract (Mainwork + Supplement) – 2nd Edition
RM320.00The expansion and maturing of the nation’s construction industry in recent years has seen corresponding growth and development in the field of construction law. Players in the industry would have observed the increase in the number of construction cases brought before the courts or arbitration, and statutory developments such as the enactment of the Arbitration Act 2005. Another significant development in the field is the publication of the revised PWD family of standard forms of construction contract, widely used for public sector construction, and increasingly, private sector civil engineering construction.
This book is a comprehensive and practical commentary to the PWD 203A and 203 forms of contract (2007 edition). Written in a balanced and readable style, it seeks to serve the needs of the technical person as well as the construction lawyer in the complex legal endeavor of interpreting these construction contracts. Its cause-by-clause analysis concentrates on the interpretation of all the clauses from both legal and operational aspects, and also identifies pitfalls to avoid.
The commentary contains references to relevant decided cases, local law and practice. Foreign cases of strong persuasive authority are also cited. The law stated in the book is up-to-date to June 30, 2011 and includes recent Court of Appeal decisions such as Bukit Cerakah Development Sdn Bhd v L’Grande Development Sdn Bhd [2008] 2 AMR 597 (deduction against payment certificate) and Nirwana Construction Sdn Bhd v Pengarah Jabatan Kerja Raya Negeri Sembilan Darul Khusus & Kerajaan Malaysia [2008] 4 MLJ 157 (termination of contractor’s employment).
Readers will benefit from the insights of an author who has training and wide experience in the fields of law, quantity surveying and arbitration. The book will serve as a useful reference handbook for those involved in the construction industry undertaking public sector work, such as government officials, architects, engineers, quantity surveyors, contractors, sub-contractors and construction lawyers. It is also an invaluable guide to undergraduates involved in the building and engineering disciplines.
-
Lam on Construction Claims in Malaysia
RM360.00Publication Date: Nov – 2022
Author: Amy Hiew Kar Yi, Lam Wai Loon, Serene Hiew & Ooi Hui Ying
ISBN: 9789672701682
Format: Hardcover
Country: MalaysiaRM400.00








