This Second Edition of the Conditions of Contract for EPC/Turnkey Projects has been published by the Fédération Internationale des Ingénieurs-Conseils (FIDIC) as an update of the FIDIC 1999 Conditions of Contract for EPC/Turnkey Projects (Silver Book), First Edition. Along with the FIDIC 1999 Red Book (the Conditions of Contract for Construction) and the FIDIC 1999 Yellow Book (the Conditions of Contract for Plant and Design-Build), the FIDIC 1999 Silver Book has been in widespread use for nearly two decades. These Conditions of Contract for EPC/Turnkey Projects are not suitable for use in the following circumstances: – If there is insufficient time or information for tenderers to scrutinise and check the Employer’s Requirements or for them to carry out their designs, risk assessment studies and estimating; – If construction will involve substantial work underground or work in other areas which tenderers cannot inspect, unless special provisions are provided to account for unforeseen conditions or – If the Employer intends to supervise closely or control the Contractor’s work, or to review most of the construction drawings. FIDIC recommends that the Second Edition of the FIDIC Yellow Book (Conditions of Contract for Plant and Design-Build) be used in the above circumstances for Works designed by (or on behalf of) the Contractor. This Second Edition of the FIDIC Silver Book maintains the principles of risk sharing established in the 1999 edition, while seeking to build on the substantial experience gained from its use over the past 18 years. For example, this edition provides: 1) greater detail and clarity on the requirements for notices and other communications; 2) provisions to address Employers’ and Contractors’ claims treated equally and separated from disputes; 3) mechanisms for dispute avoidance and 4) detailed provisions for quality management, and verification of Contractor’s contractual compliance. These Conditions of Contract for EPC/Turnkey Projects include conditions, which are likely to apply to the majority of such contracts. Essential items of information which are particular to each individual contract are to be included in the Particular Conditions Part A – Contract Data. In addition it is recognised that many Employers, especially governmental agencies, may require special conditions of contract, or particular procedures, which differ from those included in the General Conditions. These should be included in Part B – Special Provisions. It should be noted, that the General Conditions and the Particular Conditions (Part A – Contract Data and Part B – Special Provisions) are all part of the Conditions of Contract. To assist Employers in preparing tender documents and in drafting Particular Conditions of Contract for specific contracts, this publication includes Notes on the Preparation of Tender Documents and Notes on the Preparation of Special Provisions, which provide important advice to drafters of contract documents, in particular the Employer’s Requirements and Special Provisions. In drafting Special Provisions, if clauses in the General Conditions are to be replaced or supplemented and before incorporating any example wording, Employers are urged to seek legal and engineering advice in an effort to avoid ambiguity and to ensure completeness and consistency with the other provisions of the contract. This publication begins with a series of comprehensive flow charts which typically show, in visual form, the sequences of activities which characterise the FIDIC EPC/Turnkey form of contract. The charts are illustrative, however, and must not be taken into consideration in the interpretation of the Conditions of Contract. This publication also includes a number of sample forms to help both Parties to develop a common understanding of what is required by third parties such as providers of securities and guarantees. Drafters of contract documents are reminded that the General Conditions of all FIDIC contracts are protected by copyright and trademark and may not be changed without specific written consent, usually in the form of a licence to amend, from FIDIC. If drafters wish to amend the provisions found in the General Conditions, the place for doing this is in the Particular Conditions Part B – Special Provisions, as mentioned above, and not by making changes in the General Conditions as published. FIDIC considers the official and authentic texts to be the versions in the English language.
FIDIC: Conditions of Contract for EPC/turnkey Projects, 2nd Edition
RM262.00
ISBN: 9782884320832
Year of Publication: 2017
Sold out!
| Category: | Construction Law |
|---|
Related products
-
Malaysian Specialist Intellectual Property and Construction Courts: Practice & Procedure
RM200.00- Publication Date :Â Dec – 2020
- Author :Â Dato Lim Chong Fong
- ISBN :Â 9789672919162
- Format :Â Hardcover + eBook
- Country :Â Malaysia
-
Wilmot-Smith on Construction Contracts, Fourth Edition
RM1,568.00Authors: Richard Wilmot-Smith, Paul Darling QC
ISBN: 9780198832805
Published: 25 May 2021
Format: Hardback
Publisher: Oxford University Publishing (UK)RM1,650.00 -
Dealing with Delay and Disruption on Construction Projects
RM1,558.00Dealing with Delay and Disruption on Construction Contracts provides construction lawyers with the understanding of how these topics can affect construction projects, how to plan for them and what to look out for when making claims. Led by a team of lawyers – with input from relevant experts – this title covers how the topic is dealt with in standard forms (such as FIDIC, JCT and NEC), as well as a variety of comparative jurisdictions.Provides an understanding of how delay and disruption can affect construction projects, how to plan for them and what to look out for when making claimsExplains how to plan for delay and disruption during the procurement and drafting stage, covering how these topics are addressed in standard form contracts, including JCT, NEC and FIDICCombines coverage of both technical and legal aspectsIntroduces the concepts of delay and disruption and the process of structuring claims, including discussion of extension of time (EOT) and concurrent delayProvides an overview of delay methodologies and how compensation for prolongation is addressed, as well as quantification principlesCovers valuation methodologies and principals, as well as acceleration entitlementIntroduces disruption causation principles and quantification principlesDiscusses the disruption methodologies of causation and quantificationExplains how to deal with delay & disruption subcontract claims, and employer claims, including liquidated damagesDescribes the common procedural requirements for advancing delay & disruption claimsCovers how BIM and 4D animation can be used in presenting delay & disruption claims and analyses the tools needed to present a delay or disruption case at arbitrationDescribes the issues that should be considered during contract negotiations such that disputes over delay & disruption can be avoidedGives practical guidance on project management and covers the delay & disruption issues related to project financeAuthored by a team led by the Freshfields Dubai and London office, plus an assortment of technical expertsAlso covers comparative law considerations throughout, covering 12 key jurisdictions, including UAE, UK, US, China and Germany.RM1,731.65 -
Security of Payments & Construction Adjudication, 3rd Edition
RM765.00- Publication Date: Jul – 2022
- Author: Chow Kok Fong
- ISBN: 9789815019254
- Format: Hardcover
- Country: Singapore
RM850.00 -
Construction Law in Malaysia
RM368.00This is the first book which deals solely with Construction Law in Malaysia. It is also the first book which discusses the new Construction Industry Payment and Adjudication Act (CIPAA). CIPAA as promulgated by Parliament this year through the intensive efforts of CIDB and related promoters will radically change construction practice in Malaysia.
Authored by two experienced and highly-respected construction law professionals, the book which is written in a clear and concise manner provides an overview of the whole law relating to construction in this country as well as a detailed coverage of many of its important aspects.
It is intended to be an authoritative and invaluable resource for legal practitioners, construction professionals, contractors, developers, employers, students, as well as those requiring an insight into the law and practice of construction law. It supplements the many other books written on various aspects of construction law in Malaysia to date.
The key elements of construction law that are considered include the Malaysian law and its administration, contract law, law of tort, key issues in construction contracts, implementation of construction contracts, financial issues in construction contracts, considerations as to time, suspension and determination, completion and finalization of the contract, construction claims and disputes as well as adjudication.
The book sets out and updates significant new developments in construction law and practice, including coverage of current contract procurement and implementation issues, dispute resolution and recent case law.
-
The Law of Construction Disputes, 3rd Edition
RM2,100.00Now in a fully updated third edition, The Law of Construction Disputes is a leading source of authoritative and detailed information on the whole area of construction law including contracts and their performance, third parties, pursuing claims and dispute resolution. It covers the construction dispute process by analysing the main areas from which disputes arise, up to date case law, and how to effectively deal with construction project disputes once they have arisen. Now including references to the new FIDIC contracts, which were released in 2017, this edition expands on advanced practitioner issues, as well as the emerging law of construction disputes on an international basis and gives the practitioner all the case law needed in one concise volume.
The book examines the methods and methodology of construction law, not only for a common law context, but also under other legal systems. Readers will be guided through the various international contract formats governing construction, alongside applicable case law. Additionally, they will be shown the correct contract provisions and forms used to prevent disputes from escalating in order to reach successful conclusions without litigation.
Including expert advice and many relevant reference materials, this book is an extremely helpful guide to legal practitioners and construction professionals.
Table of Contents
1. Introduction to Construction Disputes 2. The Construction Contract 3. Design Disputes and Liability 4. Site Conditions 5. The Subcontractor 6. Defences to Construction Disputes 7. Issues Regarding Contractors Rights and Obligations Under Standard Form Agreements 8. Termination of Contract 9. The Certification Process 10. Types of Claims 11. Collateral Warranties 12. Non-Contract Liability 13. Time at Large and Time-Bar Clauses 14. Dispute Resolution 15. Key Issues in Dispute Resolution -
Emden’s Construction Law | 2023 (3 Volumes)
RM2,500.00Author:Â Emdens
Format: Hard Cover
ISBN: 9789395116688
Edition: Indian Reprint 2023
Language:Â English
Country: UK -
Construction Defect Claims in Malaysia
RM300.00Authors: Teng Kam Wah
Publisher: Sweet & Maxwell AsiaThis book focuses on the legal perspectives of claims for losses for defective work by and against the contractor. It also covers professional negligence, claims for pure economical loss, latent defects, as well as claims for financial and non-financial losses.








