It is the first book of its kind comparing selected domestic and international standard form of building contracts. It is a complete compendium on construction law as practised in standard form of building contracts as follows:
Division 1: Historical Development of the selected Standard Form of Building Contracts This Division provides a general introduction based on the historical development, overview and comment on its practicality and popularity, etc of the selected standard form of building contracts. There is a discussion on the judicial interpretation and development pertaining to these standard form of building contracts.
Division 2: Selected Standard Form of Building Contracts are compared including PAM Form 2018, AIAC (2019), PWD 203A, CIDB (2000), IEM (2017), FIDIC Red Book (2017) and JCT (2016) This Division provides a comparative overview on the differences and similarities of the selected standard form of contracts. The PAM Form 2018 is used as the starting point and six (6) different standard form of building contracts are selected for comparison namely, AIAC (2019), PWD 203A, CIDB (2000), IEM (2017), FIDIC Red Book (2017) and JCT (2016).
Division 3: PAM Form 2018 compared with other selected Standard Form of Building Contracts This Division provides a detailed commentary of the PAM Form 2018 with comparison of relevant clauses of selected standard form of building contracts. It includes analysis, comments, observations and applicable legal authorities on PAM Form 2018 together with discussion on the differences and similarities among the other selected standard form of building contracts.
Division 4: Other clauses provided in other selected Standard Form of Building Contracts, not in the PAM Form 2018 This Division provides a detailed discussion of the key subject matters of the selected standard form of building contracts which are not found in the PAM Form 2018.
This book is written with the support of special contributors, Ir. Harbans Singh K. S. and Lam Wai Loon together with a group of talented young lawyers as part of the Editorial Board consisting of Ng Chu Yin (also qualified as a Quantity Surveyor), Heather Yee Jing Wah, Lee Kai Jun, Naveen Sri Kantha, Leong Chee Weng, Sameera Hassan, James Ding Tse Wen, Ashley Ooi Hui Ying and Ankit Sanghvi.
| Chapters | Contents |
|---|---|
| – | Foreword 1 |
| – | Foreword 2 |
| – | Foreword 3 |
| – | Preface and Acknowledgements |
| – | The Author |
| – | Special Contributors |
| – | Editorial Board |
| – | Table of Cases |
| – | Table of Statutes |
| – | Table of Subsidiary Legislation |
| – | Table of Foreign Legislation |
| Volume 1 – Division 1: Historical Development of the Standard Form of Building Contracts | |
| 1.1 | Overview |
| 1.2 | Malaysian Government/Public Sector Enterprises Contracts |
| 1.3 | Private Sector Contracts |
| 1.4 | International Standard Form of Contracts |
| 1.5 | The Scope of the Book |
| Division 2: The PAM Form 2018, the AIAC (2019), the PWD 203A, the CIDB (2000), the IEM (2017), the JCT (2016) and the FIDIC Red Book (2017) are the Selected Standard Form of Building Contracts Compared | |
| 1 | Overview |
| 2 | Contractor’s General Obligations |
| 2.1 | Commentary on Contractor’s General Obligations |
| 3 | Materials, Goods and Workmanship to Conform to Description, Testing and Inspection |
| 3.1 | Comparison of Materials, Goods and Workmanship to Conform to Description, Testing and Inspection Clause Between PAM Form 2018 and the Other Standard Form of Contracts |
| 4 | Variation, Provisional and Prime Cost Sums |
| 4.1 | Comparison of Variation, Provisional and Prime Cost Sums Clause Between PAM Form 2018 and the Selected Standard Form of Contracts |
| 4.2 | Definition of Variations |
| 4.3 | Variation Instruction |
| 4.4 | Issuance of Variations After Practical Completion |
| 4.5 | Issuance of AI on P.C. Sums and Provisional Sums |
| 4.6 | Valuation of Variation |
| 4.7 | Rules of Valuation for Variation |
| 4.8 | Additional Expense Caused by Variation |
| 5 | Practical Completion and Defects Liability |
| 5.1 | Comparison of Practical Completion and Defects Liability Clause Between PAM Form 2018 and the Selected Standard Form of Contracts |
| 5.2 | The Requirements to Achieve Practical Completion |
| 5.3 | The Definition of Practical Completion |
| 5.4 | Practical Completion |
| 5.5 | The Notification |
| 5.6 | Procedures Subsequent to the Notice of Practical Completion |
| 5.7 | Procedures Subsequent to Rejection of Practical Completion |
| 5.8 | Consequences of Default to Issue or Reject Within the Stipulated Timeline |
| 5.9 | Obligation to Return Possession of the Site |
| 5.10 | Failure to Attend to the Works and Defects of a Minor Nature |
| 5.11 | Definition of Defects |
| 5.12 | Rectification of Defects |
| 5.13 | Failure to Attend to the Defects |
| 5.14 | Costs of Remedying Defects |
| 5.15 | Dispute on Who Has Caused the Defects |
| 5.16 | Making Good Defects |
| 6 | Damages for Non-Completion |
| 6.1 | Comparison of Damages for Non-Completion Clause Between PAM Form 2018 and the Selected Standard Form of Contracts |
| 7 | Extension of Time |
| 7.1 | Commentary on Extension of Time |
| 7.2 | Contents and Adequacy of the Application for Extension of Time |
| 7.3 | Other Considerations |
| 7.4 | After the Certificate of Non-Completion |
| 8 | Loss and/or Expense |
| 8.1 | Comparison of Loss and/or Expense Provisions in PAM Form 2018 and the Selected Standard Form of Contracts |
| 8.2 | Risk Allocations on Loss and/or Expense |
| 8.3 | Grounds to Claim for Loss and/or Expense Not Provided in PAM Form 2018 |
| 8.4 | Procedure in the Last Stages of the Claims Process |
| 8.5 | The Ascertained Amount |
| 9 | Payment Application and Issuance of Architect’s Certificate |
| 9.1 | Comparison of Payment Application and Issuance of Architect’s, Contract Administrator’s and Certifier’s Certificates Between PAM Form 2018 and the Selected Standard Form of Contracts |
| 10 | Arbitration |
| 10.1 | Comparison of Arbitration Clause Between PAM Form 2018 and the Other Standard Form of Contracts |
| 11 | Performance Bond |
| 11.1 | Comparison of Performance Bond Provisions in PAM Form 2018 and the Selected Standard Form of Contracts |
| Division 3: Detailed Commentary of the PAM Form 2018 and Comparison Between PAM Form 2018 and the Selected Standard Form of Contracts | |
| i | Overview |
| 1 | Clause 1.0: Contractor’s Obligations |
| 1.0 | Overview |
| 1.1 | Clause 1.1: Completion of Works in Accordance with Contract Documents |
| 1.2 | Clause 1.2: Temporary Work and Construction Method |
| 1.3 | Clause 1.3: Contractor’s Design and Responsibilities |
| 1.4 | Clause 1.4: Discrepancy or Divergence Between Documents |
| 2 | Clause 2.0: Architect’s Instructions (“AI”) |
| 2.0 | Overview |
| 2.1 | Clause 2.1: Contractor to Comply with AI |
| 2.2 | Clause 2.2: Architect’s Instructions |
| 2.3 | Clause 2.3: Provisions Empowering Instructions |
| 2.4 | Clause 2.4: Failure of Contractor to Comply with AI |
| 3 | Clause 3.0: Contract Documents, Programme and As-built Drawings |
| 3.1 | Clause 3.1: Contract Documents |
| 3.2 | Clause 3.2: Custody of Tender Documents |
| 3.3 | Clause 3.3: Copies of Documents |
| 3.4 | Clause 3.4: Further Drawings or Details |
| 3.5 | Clause 3.5: Works Programme |
| 3.6 | Clause 3.6: Programme Not Part of Contract |
| 3.7 | Clause 3.7: Architect’s Acceptance of Programme |
| 3.8 | Clause 3.8: Availability of Documents |
| 3.9 | Clause 3.9: Limitation of Use of Documents |
| 3.10 | Clause 3.10: As-built Drawings and Operation and Maintenance Manuals |
| 4 | Clause 4.0: Statutory Obligations, Notices, Fees and Charges |
| 4.1 | Clause 4.1: Statutory Requirements |
| 4.2 | Clause 4.2: Inconsistencies with Statutory Requirements |
| 4.3 | Clause 4.3: Conforming to Statutory Obligations |
| 4.4 | Clause 4.4: Fees, Levies and Charges |
| 5 | Clause 5.0: Levels and Setting Out of the Works |
| 5.0 | Overview |
| 5.1 | Clause 5.1: Setting Out |
| 6 | Clause 6.0: Materials, Goods and Workmanship to Conform to Description, Testing and Inspection |
| 6.0 | Overview |
| 6.1 | Clause 6.1: Standard of Works, Materials, Goods and Workmanship |
| 6.2 | Clause 6.2: Provision of Vouchers |
| 6.3 | Clause 6.3: Inspection and Testing |
| 6.4 | Clause 6.4: Contractor’s Obligation Not Relieved |
| 6.5 | Clause 6.5: Works Not in Accordance with the Contract |
| 6.6 | Clause 6.6: No Compensation for Time and Cost |
| 6.7 | Clause 6.7: Failure of Contractor to Comply |
| 6.8 | Clause 6.8: Warranties in Respect of Materials and Goods |
| 7 | Clause 7.0: Royalties and Intellectual Property Rights |
| 7.0 | Overview |
| 7.1 | Clause 7.1: Indemnity to Owner |
| 7.2 | Clause 7.2: Contractor’s Liability to Pay |
| 7.3 | Clause 7.3: Government Royalties |
| 8 | Clause 8.0: Site Agent |
| 8.0 | Overview |
| 8.1 | Clause 8.1: Site Agent |
| 8.2 | Clause 8.2: Instructions to Site Agent |
| 8.3 | Clause 8.3: Exclusion of Person Employed on the Works |
| 9 | Clause 9.0: Access to the Works |
| 9.0 | Overview |
| 9.1 | Clause 9.1: Access to the Works |
| 10 | Clause 10.0: Site Staff |
| 10.0 | Overview |
| 10.1 | Clause 10.1: Duty of Site Staff |
| 10.2 | Clause 10.2: Directions Given by Site Staff |
| 11 | Clause 11.0: Variations, Provisional and Prime Cost Sums |
| 11.0 | Overview |
| 11.1 | Clause 11.1: Definition of Variation |
| 11.2 | Clause 11.2: No Variations Required by Architect Shall Vitiate Contract |
| 11.3 | Clause 11.3: Issue of Variations After Practical Completion |
| 11.4 | Clause 11.4: AI on P.C. Sums and Provisional Sums |
| 11.5 | Clause 11.5: Valuation of Variations and Provisional Sums |
| 11.6 | Clause 11.6: Valuation Rules |
| 11.7 | Clause 11.7: Additional Expense Caused by Variation |
| 11.8 | Clause 11.8: Access to Contractor’s Books and Documents |
| 11.9 | Clause 11.9: Variations and Additional Expenses Added to Contract Sum |
| 12 | Clause 12.0: Contract Bills |
| 12.0 | Overview |
| 12.1 | Clause 12.1: Measurement of Building Works |
| 12.2 | Clause 12.2: Correction of Errors or Omissions |
| Chapters | Contents |
| Clauses in PAM Form 2018 | |
| 13.0 | Clause 13.0: Contract Sum |
| 13.0 | Overview |
| 13.1 | Clause 13.1: Contract Sum not to be adjusted or altered |
| 14.0 | Clause 14.0: Materials and Goods |
| 14.0 | Overview |
| 14.1 | Clause 14.1: Materials and goods not to be removed |
| 14.2 | Clause 14.2: Materials and goods included in certificates |
| 14.3 | Clause 14.3: Responsibility for materials and goods |
| 14.4 | Clause 14.4: Warranty of title of goods and materials |
| 15.0 | Clause 15.0: Practical Completion and Defects Liability |
| 15.0 | Overview |
| 15.1 | Clause 15.1: Practical Completion |
| 15.2 | Clause 15.2: Certificate of Practical Completion |
| 15.3 | Clause 15.3: Contractor’s failure to comply with undertaking |
| 15.4 | Clause 15.4: Schedule of Defects |
| 15.5 | Clause 15.5: Instruction to make good defects |
| 15.6 | Clause 15.6: Certificate of Making Good Defects |
| 16.0 | Clause 16.0: Partial Possession By Employer |
| 16.0 | Overview |
| 16.1 | Clause 16.1: Possession of Occupied Part with consent |
| 16.2 | Clause 16.2: Possession of Occupied Part without consent |
| 16.3 | Clause 16.3: Contractor to remove equipment |
| 17.0 | Clause 17.0: Assignment and Sub-Contracting |
| 17.0 | Overview |
| 17.1 | Clause 17.1: Assignment by Employer |
| 17.2 | Clause 17.2: Assignment by Contractor |
| 17.3 | Clause 17.3: No sub-contracting |
| 18.0 | Clause 18.0: Injury to Person or Loss and/or Damage of Property and Indemnity to Employer |
| 18.0 | Overview |
| 18.1 | Clause 18.1: Contractor’s indemnity against injury or death |
| 18.2 | Clause 18.2: Contractor’s indemnity against loss and/or damage |
| 18.3 | Clause 18.3: Contractor’s indemnity against claims by workmen |
| 18.4 | Clause 18.4: Indemnities not to be defeated |
| 19.0 | Clause 19.0: Insurance Against Injury to Person or Loss and/or Damage of Property |
| 19.0 | Overview |
| 19.1 | Clause 19.1: Contractor to insure against injury to person and loss and/or damage of property |
| 19.2 | Clause 19.2: Employees’ social security scheme for local workmen |
| 19.3 | Clause 19.3: Insurance for local workmen not subject to SOCSO |
| 19.4 | Clause 19.4: Workmen’s compensation insurance for foreign workers |
| 19.5 | Clause 19.5: Placing of insurance with licensed insurance companies |
| 20.0 | Clauses 20.A, 20.B & 20.C: Insurance of Buildings/Works |
| 20.0 | Overview |
| 20.A | Clause 20.A: Insurance Of New Buildings/Works – By The Contractor |
| 20.A.1 | Clause 20.A.1: Contractor’s risks – new buildings/works |
| 20.A.2 | Clause 20.A.2: Additional risks to be covered under the insurance |
| 20.A.3 | Clause 20.A.3: Placing of insurance with licensed insurance companies |
| 20.A.4 | Clause 20.A.4: Application of insurance claim proceeds |
| 20.B | Clause 20.B: Insurance Of New Buildings/Works – By The Employer |
| 20.B.1 | Clause 20.B.1: Insurance by Employer |
| 20.B.2 | Clause 20.B.2: Additional risks required by the Contractor |
| 20.B.3 | Clause 20.B.3: Maintenance of policy |
| 20.B.4 | Clause 20.B.4: Failure of Employer to insure |
| 20.B.5 | Clause 20.B.5: Application of insurance claim proceeds |
| 20.C | Clause 20.C: Insurance Of Existing Building or Extension – By The Employer |
| 20.C.1 | Clause 20.C.1: Employer’s risks – existing building or extension |
| 20.C.2 | Clause 20.C.2: Additional risks required by the Contractor |
| 20.C.3 | Clause 20.C.3: Maintenance of insurance by Employer |
| 20.C.4 | Clause 20.C.4: Failure of Employer to insure |
| 20.C.5 | Clause 20.C.5: Application of insurance claim proceeds |
| 21.0 | Clause 21.0: Date of Commencement, Postponement and Completion Date |
| 21.0 | Overview |
| 21.1 | Clause 21.1: Commencement and Completion |
| 21.2 | Clause 21.2: Sectional Commencement Dates |
| 21.3 | Clause 21.3: Sectional Completion Dates |
| 21.4 | Clause 21.4: Postponement or suspension of the Works |
| Volume 2 | |
| 22.0 | Clause 22.0: Damages for Non-Completion |
| 22.0 | Overview |
| 22.1 | Clause 22.1: Liquidated Damages and Certificates of Non-Completion |
| 22.2 | Clause 22.2: Agreed Liquidated Damages amount |
| 22.3 | Clause 22.3: Certificate of Non-Completion revoked by subsequent Certificate of Extension of Time |
| 23.0 | Clause 23.0: Extension of Time |
| 23.0 | Overview |
| 23.1 | Clause 23.1: Submission of notice and particulars for extension of time |
| 23.2 | Clause 23.2: Delay by Nominated Sub-Contractor |
| 23.3 | Clause 23.3: Insufficient information |
| 23.4 | Clause 23.4: Certificate of Extension of Time |
| 23.5 | Clause 23.5: Other consideration for extension of time |
| 23.6 | Clause 23.6: Contractor to prevent delay |
| 23.7 | Clause 23.7: Notification to Nominated Sub-Contractors |
| 23.8 | Clause 23.8: Relevant Events |
| 23.9 | Clause 23.9: Extension of time after the issuance of Certificate of Non-Completion |
| 23.10 | Clause 23.10: Architect’s review of extension of time after practical completion |
| 24.0 | Clause 24.0: Loss and/or Expense Caused by Matters Affecting The Regular Progress Of The Works |
| 24.0 | Overview |
| 24.1 | Clause 24.1: Loss and/or expense caused by matters affecting the regular progress of the works |
| 24.2 | Clause 24.2: Access to Contractor’s books and documents |
| 24.3 | Clause 24.3: Matters materially affecting the regular progress of the Works |
| 24.4 | Clause 24.4: Loss and/or expense to be included in certificate |
| 25.0 | Clause 25.0: Determination of Contractor’s Employment by Employer |
| 25.0 | Overview |
| 25.1 | Clause 25.1: Defaults by Contractor |
| 25.2 | Clause 25.2: Procedure for determination |
| 25.3 | Clause 25.3: Contractor’s insolvency |
| 25.4 | Clause 25.4: Rights and duties of employer and contractor |
| 25.5 | Clause 25.5: Records of Works |
| 25.6 | Clause 25.6: Final Account upon determination |
| 25.7 | Clause 25.7: Remedy limited to damages only |
| 25.8 | Clause 25.8: Employer’s rights and remedies not prejudiced |
| 26.0 | Clause 26.0: Determination of Own Employment by Contractor |
| 26.0 | Overview |
| 26.1 | Clause 26.1: Defaults by Employer |
| 26.2 | Clause 26.2: Procedure for determination |
| 26.3 | Clause 26.3: Employer’s insolvency |
| 26.4 | Clause 26.4: Rights and duties of Contractor and Employer |
| 26.5 | Clause 26.5: Records of Works |
| 26.6 | Clause 26.6: Settlement of accounts |
| 26.7 | Clause 26.7: Contractor’s rights and remedies not prejudiced |
| 27.0 | Clause 27.0: Nominated Sub-Contractors |
| 27.0 | Overview |
| 27.1 | Clause 27.1: P.C. Sums and Provisional Sums – Nominated Sub-Contractors |
| 27.2 | Clause 27.2: Nomination of sub-contractor |
| 27.3 | Clause 27.3: Objection to nomination of Sub-Contractor |
| 27.4 | Clause 27.4: Action following objection of Nominated Sub-Contractor |
| 27.5 | Clause 27.5: Payment by Contractor to Nominated Sub-Contractors |
| 27.6 | Clause 27.6: Failure of Contractor to pay Nominated Sub-Contractors |
| 27.7 | Clause 27.7: Final payment to Nominated Sub-Contractors |
| 27.8 | Clause 27.8: Determination of Nominated Sub-Contractor’s employment |
| 27.9 | Clause 27.9: Contractor’s responsibility for Nominated Sub-Contractors |
| 27.10 | Clause 27.10: Employer has no privity of contract with Nominated Sub-Contractors |
| 27.11 | Clause 27.11: Re-nomination of sub-contractor due to determination by the Contractor |
| 27.12 | Clause 27.12: Re-nomination of sub-contractor due to determination by the Nominated Sub-Contractor |
| 27.13 | Clause 27.13: Contractor to recover additional expenses from Nominated Sub-Contractor |
| 27.14 | Clause 27.14: Contractor permitted to tender for P.C. Sums |
| 28.0 | Clause 28.0: Nominated Suppliers |
| 28.0 | Overview |
| 28.1 | Clause 28.1: P.C. Sums and Provisional Sums – Nominated Suppliers |
| 28.2 | Clause 28.2: Nominated Suppliers and their obligations |
| 28.3 | Clause 28.3: Objection to Nominated Suppliers |
| 28.4 | Clause 28.4: Action following objection of suppliers |
| 28.5 | Clause 28.5: Value of materials and goods supplied by Nominated Suppliers |
| 28.6 | Clause 28.6: Payment to Nominated Suppliers |
| 28.7 | Clause 28.7: Contractor’s liability for Nominated Suppliers |
| 28.8 | Clause 28.8: Employer no privity of Contract with Nominated Suppliers |
| 29.0 | Clause 29.0: Works By Craftsmen, Tradesmen Or Other Contractors Employed Or Engaged By Employer |
| 29.0 | Overview |
| 29.1 | Clause 29.1: Works by Employer’s Craftsmen |
| 30.0 | Clause 30.0: Certificates and Payments |
| 30.0 | Overview |
| 30.1 | Clause 30.1: Payment application and issuance of Architect’s certificate |
| 30.2 | Clause 30.2: Amount due in Architect’s certificate |
| 30.3 | Clause 30.3: Errors in payment certificate |
| 30.4 | Clause 30.4: Set-off by Employer |
| 30.5 | Clause 30.5: Retention fund |
| 30.6 | Clause 30.6: Rules regarding Retention Fund |
| 30.7 | Clause 30.7: Suspension of Works for non-payment |
| 30.8 | Clause 30.8: Compulsory suspension of Works |
| 30.9 | Clause 30.9: Cessation insurance resulting from suspension of the Works |
| 30.10 | Clause 30.10: Final Account |
| 30.11 | Clause 30.11: Items in Final Account |
| 30.12 | Clause 30.12: Conclusiveness of the Final Account |
| 30.13 | Clause 30.13: Issuance of Penultimate Certificate |
| 30.14 | Clause 30.14: Issue of Final Certificate |
| 30.15 | Clause 30.15: Final Certificate |
| 30.16 | Clause 30.16: Final Certificate not conclusive |
| 30.17 | Clause 30.17: Interest |
| 31.0 | Clause 31.0: Outbreak of Hostilities |
| 31.0 | Overview |
| 31.1 | Clause 31.1: Hostilities – Determination by Employer or Contractor |
| 31.2 | Clause 31.2: Notices of determination |
| 31.3 | Clause 31.3: AI regarding protective work |
| 31.4 | Clause 31.4: Payment resulting from determination |
| 32.0 | Clause 32.0: War Damage |
| 32.0 | Overview |
| 32.1 | Clause 32.1: Procedures Following War Damage |
| 32.2 | Clause 32.2: Definition of War Damage |
| 33.0 | Clause 33.0: Antiquities |
| 33.0 | Overview |
| 33.1 | Clause 33.1: Antiquities property of Employer |
| 34.0 | Clause 34.0: Mediation |
| 34.0 | Overview |
| 34.1 | Clause 34.1: Mediation under PAM Rules |
| 34.2 | Clause 34.2: Mediation does not prejudice the parties’ rights to arbitration |
| 35.0 | Clause 35.0: Expert Determination |
| 35.0 | Overview |
| 35.1 | Clause 35.1: Disputes on all matters |
| 35.2 | Clause 35.2: Expert determination under PAM Rules |
| 35.3 | Clause 35.3: Expert determination shall not prejudice the parties’ rights to adjudication or arbitration |
| 36.0 | Clause 36.0: Adjudication |
| 36.0 | Overview |
| 36.1 | Clause 36.1: Set-off disputes referred to adjudication |
| 36.2 | Clause 36.2: Notice to refer to adjudication |
| 36.3 | Clause 36.3: Adjudication Rules |
| 36.4 | Clause 36.4: Decision of the adjudicator |
| 37.0 | Clause 37.0: Arbitration |
| 37.0 | Overview |
| 37.1 | Clause 37.1: Disputes referred to arbitration |
| 37.2 | Clause 37.2: Procedures for appointment of arbitrator |
| 37.3 | Clause 37.3: Arbitration Act and Rules |
| 37.4 | Clause 37.4: Powers of arbitrator |
| 37.5 | Clause 37.5: Consolidation of arbitration proceedings |
| 37.6 | Clause 37.6: Commencement of arbitration proceeding |
| 37.7 | Clause 37.7: Arbitrator’s award to be final and binding on parties |
| 38.0 | Clause 38.0: Notice |
| 38.0 | Overview |
| 38.1 | Clause 38.1: Notice |
| 38.2 | Clause 38.2: Notice deem served |
| 38.3 | Clause 38.3: Proof of Notice |
| 38.4 | Clause 38.4: Written communication |
| 39.0 | Clause 39.0: Performance Bond |
| 39.0 | Overview |
| 39.1 | Clause 39.1: Submission of Performance Bond |
| 39.2 | Clause 39.2: Form of the Performance Bond |
| 39.3 | Clause 39.3: Validity of the Performance Bond |
| 39.4 | Clause 39.4: Failure to extend the validity |
| 39.5 | Clause 39.5: Payments from the Performance Bond |
| 39.6 | Clause 39.6: Return of Performance Bond |
| 40.0 | Clause 40.0: Governing Law |
| 40.1 | Clause 40.1: Governing Law |
| Division 4 – Other Clauses in Selected Standard Form of Building Contracts Not Found in PAM Form 2018 | |
| 1 | Overview |
| 2 | Contractor’s General Obligations |
| 2.1 | AIAC (2019) |
| 2.2 | PWD 203A |
| 2.3 | CIDB (2000) |
| 2.4 | IEM (2017) |
| 2.5 | FIDIC Red Book (2017) |
| 3 | Materials, Goods and Workmanship |
| 3.1 | PWD 203A |
| 3.2 | CIDB (2000) |
| 3.3 | JCT (2016) |
| 4 | Variation, Provisional and Prime Cost Sums |
| 4.1 | FIDIC Red Book (2017) |
| 4.2 | JCT (2016) |
| 5 | Practical Completion and Defects Liability |
| 5.1 | PWD 203A |
| 5.2 | CIDB (2000) |
| 5.3 | FIDIC Red Book (2017) |
| 6 | Damages for Non-Completion |
| 6.1 | CIDB (2000) |
| 6.2 | FIDIC Red Book (2017) |
| 7 | Extension of Time |
| 7.1 | AIAC (2019) |
| 8 | Loss and/or Expense |
| 8.1 | AIAC (2019) |
| 9 | Payment Application and Issuance of Architect’s Certificate |
| 9.1 | AIAC (2019) |
| 9.2 | FIDIC Red Book (2017) |
| 9.3 | JCT (2016) |
| 10 | Arbitration |
| 10.1 | AIAC (2019) |
| 10.2 | CIDB (2000) |
| 10.3 | FIDIC Red Book (2017) |
| 11 | Performance Bond |
| 11.1 | AIAC (2019) |
| 11.2 | PWD 203A |
| 12 | Inspection of Site |
| 12.1 | PWD 203A |
| 12.2 | FIDIC Red Book (2017) |
| 13 | Bills of Quantities and Provisional Quantities |
| 13.1 | PWD 203A |
| 14 | Soil Investigation |
| 14.1 | IEM (2017) |
| 15 | Planning Approval |
| 15.1 | IEM (2017) |
| 16 | Labour |
| 16.1 | PWD 203A |
| 16.2 | CIDB (2000) |
| 16.3 | IEM (2017) |
| 16.4 | FIDIC Red Book (2017) |
| 17 | Public Interference |
| 17.1 | AIAC (2019) |
| 17.2 | IEM (2017) |
| 17.3 | FIDIC Red Book (2017) |
| 18 | Transport and Public Roads |
| 18.1 | IEM (2017) |
| 19 | Use of Explosives |
| 19.1 | IEM (2017) |
| 20 | Facilities for Other Contractors |
| 20.1 | AIAC (2019) |
| 20.2 | PWD 203A |
| 20.3 | IEM (2017) |
| 20.4 | FIDIC Red Book (2017) |
| 21 | Materials and Equipment Supplied by the Employer |
| 21.1 | IEM (2017) |
| 22 | Ownership of Excavated Materials |
| 22.1 | IEM (2017) |
| 23 | Constructional Plant and Equipment |
| 23.1 | PWD 203A |
| 23.2 | IEM (2017) |
| 24 | Slow Progress of Construction/Expediting Progress of Works |
| 24.1 | CIDB (2000) |
| 24.2 | IEM (2017) |
| 24.3 | FIDIC Red Book (2017) |
| 25 | Early Use by the Employer |
| 25.1 | JCT (2016) |
| 26 | Information Release Schedule |
| 26.1 | JCT (2016) |
| 27 | Selection of Domestic Sub-Contractors |
| 27.1 | JCT (2016) |
| 28 | Insurance/Indemnity |
| 28.1 | JCT (2016) |
| 28.2 | FIDIC Red Book (2017) |
| 29 | Assignment, Third Party Rights and Collateral Warranties |
| 29.1 | JCT (2016) |
| 30 | Termination/Determination |
| 30.1 | AIAC (2019) |
| 30.2 | PWD 203A |
| 30.3 | CIDB (2000) |
| 30.4 | JCT (2016) |
| 30.5 | FIDIC Red Book (2017) |
| 31 | Release from Performance under the Law |
| 31.1 | FIDIC Red Book (2017) |
| 32 | General |
| 32.1 | PWD 203A |
| 32.2 | AIAC (2019) |
| 32.3 | CIDB (2000) |
| 32.4 | FIDIC Red Book (2017) |
| 33 | Employer |
| 33.1 | FIDIC Red Book (2017) |
| 34 | Architect/Contract Administrator/Engineer |
| 34.1 | AIAC (2019) |
| 34.2 | CIDB (2000) |
| 34.3 | IEM (2017) |
| 34.4 | FIDIC Red Book (2017) |
| 35 | Advance Warning by Both Parties |
| 35.1 | FIDIC Red Book (2017) |
| 36 | Test on Completion |
| 36.1 | CIDB (2000) |
| 36.2 | FIDIC Red Book (2017) |
| 37 | Measurement and Valuation |
| 37.1 | PWD 203A |
| 37.2 | CIDB (2000) |
| 37.3 | FIDIC Red Book (2017) |
| 38 | Care of the Works |
| 38.1 | FIDIC Red Book (2017) |
| 39 | Fluctuation of Price |
| 39.1 | PWD 203A |
| 39.2 | JCT (2016) |
| 40 | Time is of Essence |
| 40.1 | PWD 203A |
| – | Conclusion |
| – | Index |