This Second Edition of the Conditions of Contract for EPC/Turnkey Projects has been published by the Fédération Internationale des Ingénieurs-Conseils (FIDIC) as an update of the FIDIC 1999 Conditions of Contract for EPC/Turnkey Projects (Silver Book), First Edition. Along with the FIDIC 1999 Red Book (the Conditions of Contract for Construction) and the FIDIC 1999 Yellow Book (the Conditions of Contract for Plant and Design-Build), the FIDIC 1999 Silver Book has been in widespread use for nearly two decades. These Conditions of Contract for EPC/Turnkey Projects are not suitable for use in the following circumstances: – If there is insufficient time or information for tenderers to scrutinise and check the Employer’s Requirements or for them to carry out their designs, risk assessment studies and estimating; – If construction will involve substantial work underground or work in other areas which tenderers cannot inspect, unless special provisions are provided to account for unforeseen conditions or – If the Employer intends to supervise closely or control the Contractor’s work, or to review most of the construction drawings. FIDIC recommends that the Second Edition of the FIDIC Yellow Book (Conditions of Contract for Plant and Design-Build) be used in the above circumstances for Works designed by (or on behalf of) the Contractor. This Second Edition of the FIDIC Silver Book maintains the principles of risk sharing established in the 1999 edition, while seeking to build on the substantial experience gained from its use over the past 18 years. For example, this edition provides: 1) greater detail and clarity on the requirements for notices and other communications; 2) provisions to address Employers’ and Contractors’ claims treated equally and separated from disputes; 3) mechanisms for dispute avoidance and 4) detailed provisions for quality management, and verification of Contractor’s contractual compliance. These Conditions of Contract for EPC/Turnkey Projects include conditions, which are likely to apply to the majority of such contracts. Essential items of information which are particular to each individual contract are to be included in the Particular Conditions Part A – Contract Data. In addition it is recognised that many Employers, especially governmental agencies, may require special conditions of contract, or particular procedures, which differ from those included in the General Conditions. These should be included in Part B – Special Provisions. It should be noted, that the General Conditions and the Particular Conditions (Part A – Contract Data and Part B – Special Provisions) are all part of the Conditions of Contract. To assist Employers in preparing tender documents and in drafting Particular Conditions of Contract for specific contracts, this publication includes Notes on the Preparation of Tender Documents and Notes on the Preparation of Special Provisions, which provide important advice to drafters of contract documents, in particular the Employer’s Requirements and Special Provisions. In drafting Special Provisions, if clauses in the General Conditions are to be replaced or supplemented and before incorporating any example wording, Employers are urged to seek legal and engineering advice in an effort to avoid ambiguity and to ensure completeness and consistency with the other provisions of the contract. This publication begins with a series of comprehensive flow charts which typically show, in visual form, the sequences of activities which characterise the FIDIC EPC/Turnkey form of contract. The charts are illustrative, however, and must not be taken into consideration in the interpretation of the Conditions of Contract. This publication also includes a number of sample forms to help both Parties to develop a common understanding of what is required by third parties such as providers of securities and guarantees. Drafters of contract documents are reminded that the General Conditions of all FIDIC contracts are protected by copyright and trademark and may not be changed without specific written consent, usually in the form of a licence to amend, from FIDIC. If drafters wish to amend the provisions found in the General Conditions, the place for doing this is in the Particular Conditions Part B – Special Provisions, as mentioned above, and not by making changes in the General Conditions as published. FIDIC considers the official and authentic texts to be the versions in the English language.
FIDIC: Conditions of Contract for EPC/turnkey Projects, 2nd Edition
RM262.00
ISBN: 9782884320832
Year of Publication: 2017
Sold out!
| Category: | Construction Law |
|---|
Related products
-
Standard Form of Building Contracts Compared
RM495.00Author: Datuk Professor Sundra Rajoo
Publication Date: Dec, 2021
ISBN: 9789672701187
Country:Â Malaysia
Format: Paperback, 2 volumesRM620.00 -
Law and Practice of Construction Law in Malaysia
RM405.00Author: Lim Chong Fong (General Editor)
Publication Date: Nov – 2021
ISBN: 9789672723028
Format: Hardcover + eBook
Country: MalaysiaRM450.00 -
Extra-Contractual Recoveries for Construction & Engineering Work (2 Vols)
RM1,345.00- Publication Date: May – 2022
- Author: Robert Fenwick Elliott
- ISBN: 9781913019570
- Format: Hardcover
- Country: U.K
-
Keating on Construction Contracts: 11th ed with 1st Supplement
RM4,098.00A classic construction law text Keating on Construction Contracts is a first port of call for all research on the history and principles governing building contracts, their practical application and their interpretation by the courts. Renowned for its accessible style, and reliable authority the title covers all relevant legislation and case law, EC law, and the FIDIC, NEC3, JCT Forms of Contracts and ICE Conditions of Contract.
The book offers solicitors, barristers and construction professionals detailed and authoritative commentary on all issues relating to construction contracts and presents in-depth practical help in a concise style, discussing legal principles, analyzing judicial decisions, interrogating standard forms, and interpreting legislation.
What’s New:
- A new chapter on Alternative Dispute Resolution (ADR)
- A revised chapter now dealing with all construction professionals
- Updates on recent appellate and TCC decisions
- An expanded chapter commenting on FIDIC forms
- Commentary on the latest NEC form, NEC4
Contents:
Chapter 1 The Nature of a Construction Contract
Chapter 2 Formation of Contract
Chapter 3 Construction of Contracts
Chapter 4 The Right to Payment and Varied Work
Chapter 5 Employer’s Approval and Architect’s Certificates
Chapter 6 Excuses for Non-performance
Chapter 7 Negligence, Economic Loss, Liability to Third Parties and Nuisance
Chapter 8 Delay and Disruption Claims
Chapter 9 Financial Recovery and Causation
Chapter 10 Liquidated Damages and Penalties
Chapter 11 Default of the Parties ¬– Various Matters
Chapter 12 Various Equitable Doctrines and Remedies
Chapter 13 Assignments, Substituted Contracts and Sub-contracts
Chapter 14 Architects, Engineers and Surveyors
Chapter 15 Public Procurement
Chapter 16 Various Legislation
Chapter 17 Arbitration and ADR
Chapter 18 The Housing Grants, Construction and Regeneration Act 1996
Chapter 19 Litigation
Chapter 20 The JCT Standard Form of Building Contract (2011 EDN)
Chapter 21 The Infrastructure Conditions of Contract, 2014 EDN
Chapter 22 The FIDIC Standard Forms
Chapter 23 NEC3 Contract
Appendix A The Housing Grants, Construction and Regeneration Act 1996 as Amended by the Local Democracy, Economic Development and Construction Act 2009
Appendix B The Scheme for Construction Contracts (England and Wales) Regulations 1998, as Amended -
The Law of Construction Disputes, 3rd Edition
RM2,100.00Now in a fully updated third edition, The Law of Construction Disputes is a leading source of authoritative and detailed information on the whole area of construction law including contracts and their performance, third parties, pursuing claims and dispute resolution. It covers the construction dispute process by analysing the main areas from which disputes arise, up to date case law, and how to effectively deal with construction project disputes once they have arisen. Now including references to the new FIDIC contracts, which were released in 2017, this edition expands on advanced practitioner issues, as well as the emerging law of construction disputes on an international basis and gives the practitioner all the case law needed in one concise volume.
The book examines the methods and methodology of construction law, not only for a common law context, but also under other legal systems. Readers will be guided through the various international contract formats governing construction, alongside applicable case law. Additionally, they will be shown the correct contract provisions and forms used to prevent disputes from escalating in order to reach successful conclusions without litigation.
Including expert advice and many relevant reference materials, this book is an extremely helpful guide to legal practitioners and construction professionals.
Table of Contents
1. Introduction to Construction Disputes 2. The Construction Contract 3. Design Disputes and Liability 4. Site Conditions 5. The Subcontractor 6. Defences to Construction Disputes 7. Issues Regarding Contractors Rights and Obligations Under Standard Form Agreements 8. Termination of Contract 9. The Certification Process 10. Types of Claims 11. Collateral Warranties 12. Non-Contract Liability 13. Time at Large and Time-Bar Clauses 14. Dispute Resolution 15. Key Issues in Dispute Resolution -
Malaysian Specialist Intellectual Property and Construction Courts: Practice & Procedure
RM200.00- Publication Date :Â Dec – 2020
- Author :Â Dato Lim Chong Fong
- ISBN :Â 9789672919162
- Format :Â Hardcover + eBook
- Country :Â Malaysia
-
Construction Disputes: Seeking Sensible Solutions
RM246.00Author: Wayne Clark’s
ISBN: 9781913019488
Country Of Publication: UK
Pub date: 25 Nov 2021
Format: HardcoverA Tribute to Stephen Hepburn
This book is dedicated to Stephen Hepburn, who I met in Interlaken, Switzerland, in July 20200, At this, our first-and, as it turned out, only – meeting, we enjoyed lunch and a few glasses of wine. Stephen encouraged me to write a book on construction contracts and claims. He encouraged me to write this book.ÂWe kept in touch regularly after our Interlaken lunch, chatting on the phone, exchanging emails and messages, and strategizing over my developing book.
Sadly, Stephen passed away suddenly on 8 January 2021. I miss him very much.Â
Rest in peace, my friend. -








