This Second Edition of the Conditions of Contract for EPC/Turnkey Projects has been published by the Fédération Internationale des Ingénieurs-Conseils (FIDIC) as an update of the FIDIC 1999 Conditions of Contract for EPC/Turnkey Projects (Silver Book), First Edition. Along with the FIDIC 1999 Red Book (the Conditions of Contract for Construction) and the FIDIC 1999 Yellow Book (the Conditions of Contract for Plant and Design-Build), the FIDIC 1999 Silver Book has been in widespread use for nearly two decades. These Conditions of Contract for EPC/Turnkey Projects are not suitable for use in the following circumstances: – If there is insufficient time or information for tenderers to scrutinise and check the Employer’s Requirements or for them to carry out their designs, risk assessment studies and estimating; – If construction will involve substantial work underground or work in other areas which tenderers cannot inspect, unless special provisions are provided to account for unforeseen conditions or – If the Employer intends to supervise closely or control the Contractor’s work, or to review most of the construction drawings. FIDIC recommends that the Second Edition of the FIDIC Yellow Book (Conditions of Contract for Plant and Design-Build) be used in the above circumstances for Works designed by (or on behalf of) the Contractor. This Second Edition of the FIDIC Silver Book maintains the principles of risk sharing established in the 1999 edition, while seeking to build on the substantial experience gained from its use over the past 18 years. For example, this edition provides: 1) greater detail and clarity on the requirements for notices and other communications; 2) provisions to address Employers’ and Contractors’ claims treated equally and separated from disputes; 3) mechanisms for dispute avoidance and 4) detailed provisions for quality management, and verification of Contractor’s contractual compliance. These Conditions of Contract for EPC/Turnkey Projects include conditions, which are likely to apply to the majority of such contracts. Essential items of information which are particular to each individual contract are to be included in the Particular Conditions Part A – Contract Data. In addition it is recognised that many Employers, especially governmental agencies, may require special conditions of contract, or particular procedures, which differ from those included in the General Conditions. These should be included in Part B – Special Provisions. It should be noted, that the General Conditions and the Particular Conditions (Part A – Contract Data and Part B – Special Provisions) are all part of the Conditions of Contract. To assist Employers in preparing tender documents and in drafting Particular Conditions of Contract for specific contracts, this publication includes Notes on the Preparation of Tender Documents and Notes on the Preparation of Special Provisions, which provide important advice to drafters of contract documents, in particular the Employer’s Requirements and Special Provisions. In drafting Special Provisions, if clauses in the General Conditions are to be replaced or supplemented and before incorporating any example wording, Employers are urged to seek legal and engineering advice in an effort to avoid ambiguity and to ensure completeness and consistency with the other provisions of the contract. This publication begins with a series of comprehensive flow charts which typically show, in visual form, the sequences of activities which characterise the FIDIC EPC/Turnkey form of contract. The charts are illustrative, however, and must not be taken into consideration in the interpretation of the Conditions of Contract. This publication also includes a number of sample forms to help both Parties to develop a common understanding of what is required by third parties such as providers of securities and guarantees. Drafters of contract documents are reminded that the General Conditions of all FIDIC contracts are protected by copyright and trademark and may not be changed without specific written consent, usually in the form of a licence to amend, from FIDIC. If drafters wish to amend the provisions found in the General Conditions, the place for doing this is in the Particular Conditions Part B – Special Provisions, as mentioned above, and not by making changes in the General Conditions as published. FIDIC considers the official and authentic texts to be the versions in the English language.
FIDIC: Conditions of Contract for EPC/turnkey Projects, 2nd Edition
RM262.00
ISBN: 9782884320832
Year of Publication: 2017
Sold out!
| Category: | Construction Law |
|---|
Related products
-
Malaysian Specialist Intellectual Property and Construction Courts: Practice & Procedure
RM200.00- Publication Date : Dec – 2020
- Author : Dato Lim Chong Fong
- ISBN : 9789672919162
- Format : Hardcover + eBook
- Country : Malaysia
-
Extra-Contractual Recoveries for Construction & Engineering Work (2 Vols)
RM1,345.00- Publication Date: May – 2022
- Author: Robert Fenwick Elliott
- ISBN: 9781913019570
- Format: Hardcover
- Country: U.K
-
FAC-1 Framework Alliance Contract: A Handbook
RM306.00Author: David MoseyISBN13: 9781913019839Published: April 2023Country of Publication: UKFormat: HARDback -
The Law of Construction Disputes, 3rd Edition
RM2,100.00Now in a fully updated third edition, The Law of Construction Disputes is a leading source of authoritative and detailed information on the whole area of construction law including contracts and their performance, third parties, pursuing claims and dispute resolution. It covers the construction dispute process by analysing the main areas from which disputes arise, up to date case law, and how to effectively deal with construction project disputes once they have arisen. Now including references to the new FIDIC contracts, which were released in 2017, this edition expands on advanced practitioner issues, as well as the emerging law of construction disputes on an international basis and gives the practitioner all the case law needed in one concise volume.
The book examines the methods and methodology of construction law, not only for a common law context, but also under other legal systems. Readers will be guided through the various international contract formats governing construction, alongside applicable case law. Additionally, they will be shown the correct contract provisions and forms used to prevent disputes from escalating in order to reach successful conclusions without litigation.
Including expert advice and many relevant reference materials, this book is an extremely helpful guide to legal practitioners and construction professionals.
Table of Contents
1. Introduction to Construction Disputes 2. The Construction Contract 3. Design Disputes and Liability 4. Site Conditions 5. The Subcontractor 6. Defences to Construction Disputes 7. Issues Regarding Contractors Rights and Obligations Under Standard Form Agreements 8. Termination of Contract 9. The Certification Process 10. Types of Claims 11. Collateral Warranties 12. Non-Contract Liability 13. Time at Large and Time-Bar Clauses 14. Dispute Resolution 15. Key Issues in Dispute Resolution -
Law, Practice and Procedure of Adjudication, 2 Volumes
RM585.00ISBN/ISSN: 9789672701767
Country: Malaysia
Author: Datuk Professor Sundra Rajoo (Author), Leong Hong Kit (Author), Cindy Wong Xien YeeRM650.00 -
Law and Practice of Construction Law in Malaysia
RM405.00Author: Lim Chong Fong (General Editor)
Publication Date: Nov – 2021
ISBN: 9789672723028
Format: Hardcover + eBook
Country: MalaysiaRM450.00 -
Wilmot-Smith on Construction Contracts, Fourth Edition
RM1,568.00Authors: Richard Wilmot-Smith, Paul Darling QC
ISBN: 9780198832805
Published: 25 May 2021
Format: Hardback
Publisher: Oxford University Publishing (UK)RM1,650.00 -
Construction Adjudication in Malaysia – 3rd Edition
RM378.00Construction Adjudication in Malaysia examines legal principles which govern the application of the CIPA Act 2012. It examines and analyses most of the important judicial decisions on construction adjudication made by the courts in Malaysia, the United Kingdom, New Zealand, Australia and Singapore. Since the publication of the second edition, there have been more than 200 reported judicial decisions from the courts in Malaysia, including the Federal Court decisions in Jack-In-Pile (M) Sdn Bhd v Bauer (M) Sdn Bhd and Ireka Engineering & Construction Sdn Bhd v PWC Corp Sdn Bhd.
Organised in 22 systematically-structured chapters, the book provides in-depth and practical guidance on all stages of the adjudication process, from the filing of a payment claim, to the commencement of adjudication proceedings, the management of the adjudication proceedings up to the delivery of the adjudication decision, as well as enforcement, stay and challenge of adjudication decisions. This is topped off with an easy-to-understand and comprehensive Practice Guide which provides a step-by-step framework to successfully navigate the entire adjudication process.
The present work is a new and revamped edition of the highly regarded first and second editions, which have been described as a ‘seminal’ book on adjudication in Malaysia, and often referred to in Malaysian court judgments. This edition will continue to serve as a useful reference for judges, legal practitioners, adjudicators and students, as well as other stakeholders in the construction industry including employers, contractors, subcontractors, suppliers and consultants.
Key Developments Covered in This Edition
- Scope of application of the CIPA Act 2012
- Scope of the exclusion provision under s 3 of the CIPA Act 2012
- Rights of a successful party under an adjudication decision, including the right to present a winding-up petition based on an adjudication decision
- Meaning of ‘payment’ under s 4 of the CIPA Act 2012, including whether it includes final account claims, and loss and expense claims
- Power of the court to sever an adjudication decision, and enforce only the good part of the decision
- The test for establishing ‘possibility of or apparent of bias’
- Requirement of ‘clear and unequivocal error’ in View Esteem explained
- Meaning of ‘fraud’ under s 15(a) of the CIPA Act 2012 defined
- Extent of immunity of Director or Acting Director of the AIAC
- Recent cases on setting aside and stay of adjudication decisions
- An updated Practice Guide on Adjudication
Table of Contents
- Introduction
- Commencement and Scope of the CIPA Act 2012
- Definitions
- Payment Claim
- Payment Response
- Initiation of Adjudication Proceeding
- Appointment of Adjudicator
- Adjudication Claim, Response and Reply
- Duties and Obligations of an Adjudicator
- Adjudicator’s Powers
- Jurisdiction of the Adjudicator
- Consolidation, Withdrawal and Concurrent Reference
- Adjudication Decision
- Costs, Fees and Expenses
- Setting Aside of Adjudication Decision
- Stay of Adjudication Decision
- Enforcement of Adjudication Decision
- AIAC: The Designated Adjudication Authority
- Conditional Payment Provisions Outlawed
- Confidentiality of Adjudication Proceeding and Adjudicator’s Immunity
- Service of Notices and Documents
- Practice Guide
RM420.00








